Past Township Water Monitoring Studies

From time to time in past years, the Township and/or private developers have tested various aspects of several aquifers. Below are links to the data for reference should future residents, Township staff, supervisors, testing contractors or others want to access them for historical or comparison purposes. Although expensive, these monitoring events did not prompt any action. It should be noted, for future debate on monitoring needs, that both BCWSA and NWWA monitor their aquifer wells frequently and report results on their websites.

November 2023 Wetland Monitoring Report
Aquetong Creek Restoration Project. Prepared by Princeton Hydro, LLC
November 2022 Riverine Monitoring Report
Aquetong Creek Restoration Project. Prepared by Princeton Hydro, LLC
November 2022 Wetland Monitoring Report
Aquetong Creek Restoration Project. Prepared by Princeton Hydro, LLC
July 30, 2020 Sustainable Water Supply Evaluation Update
Aquetong Creek drainage basin. Prepared by Uhl & Associates, Lambertville, N.J.
2007–2020 BCWSA and Carroll Engineering Monitoring of Wells in New Hope Borough
Ten reports have been filed with the Delaware River Basin Commission, which assesses the impact of water withdrawals for Solebury Township well #1s S-1, S-2, S-3 and New Hope's water system.
Dec. 19, 2008 Hydrologic Report for Logan Square Development
Production water supply wells No. 1 & 2. Prepared by Boucher & James, Inc.
June 2008 Ingham Spring Evaluation
Prepared by Uhl, Baron, Rana & Associates, Inc., Lambertville, N.J.
August 2002 Groundwater Elevation & Stream Flow Monitoring
Primrose and Aquetong Creek drainage basins. Prepared by Vincent Uhl Associates.
1926 Study of Water Conditions
Thesis submitted to University of Pennsylvania by Water S. Lapp, studying water temperature conditions, bacteriological and chemical analyses of Aquetong Spring.